Please use this identifier to cite or link to this item: https://scidar.kg.ac.rs/handle/123456789/18825
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNikolić, Miloš-
dc.date.accessioned2023-09-11T11:58:23Z-
dc.date.available2023-09-11T11:58:23Z-
dc.date.issued2021-
dc.identifier.urihttps://scidar.kg.ac.rs/handle/123456789/18825-
dc.description.abstractThe core of the dissertation is to improve energy efficiency of small hydropower plants (SHPPs). The focus is to solve the problems of (1) decreased electricity production during low water flows and (2) inadequate functioning of multi-chamber settling basins because of an uneven flow distribution among the chambers. The latter problem has been solved by an original methodology, which is an upgrade on the traditional usage of CFD and analytical models. The methodology is among the scientific contributions that are:  a method for the iterative finding of a technical solution by the use of a CFD and an ancillary analytical model, which is a guide for a complex and slow CFD model towards an optimal geometry;  a method for the determination of local pressure drops (minor losses) for complex geometrical shapes with multi-dimensional flow patterns using: CFD simulations, regression analysis, and indirect validation;  the application of modern software for the design, optimization, modeling, and modernization of SHHPs.  a novel solution for simultaneous equalization of flows among the chambers of a multi-chamber settling basin and the dissipation of turbulent kinetic energy. These results were implemented on a case study, which includes two cascade SHPPs with a common side water intake and nominal installed capacities of 1.220 MW and 1.327 MW. The solving of both problems resulted in technical solutions for:  the determination of an optimal configuration under existing conditions (gross head, turbine types, pipeline diameters) by the use of new turbine(s) and independent or coupled operation of two run-of-the-river SHPPs;  the equalization of flows among the chambers of a multi-chamber settling basin and the dissipation of turbulent kinetic energy by the use of: (a) pillars with vanes in a common inlet zone and (b) sluice gates with tranquilizing racks. The solution of the (1) problem increased the electricity production by 4.8% and the solution of the (2) problem reduced the total loss by 8%. The results are applicable to all new and existing SHPPs with side water intakes, whereas the developed methodologies exceed the field of SHPPs.en_US
dc.description.urihttps://nardus.mpn.gov.rs/handle/123456789/20997en_US
dc.language.isosren_US
dc.relationMinistarstvo prosvete, nauke i tehnološkog razvoja Republike Srbije, Ugovor br. 451-03-68/2022-14/200108 (Univerzitet u Kragujevcu, Fakultet za mašinstvo i građevinarstvo u Kraljevu)en_US
dc.subjectsmall hydropower plantsen_US
dc.subjectenergy efficiencyen_US
dc.subjectsettling basinen_US
dc.subjectCFD modelingen_US
dc.subjectmathematical modelingen_US
dc.subjectturbulent flowen_US
dc.subjectflow controlen_US
dc.subjectoptimizationen_US
dc.subjectregression analysisen_US
dc.titlePovećanje energetske efikasnosti malih hidroelektranaen_US
dc.title.alternativeIncreasing the energy efficiency of small hydropower plantsen_US
dc.typedoctoralThesisen_US
dc.description.versionPublisheden_US
dc.type.versionPublishedVersionen_US
Appears in Collections:Faculty of Mechanical and Civil Engineering, Kraljevo

Page views(s)

36

Downloads(s)

7

Files in This Item:
File Description SizeFormat 
Doktorat_Milos Nikolic_2022.pdf20.62 MBAdobe PDFThumbnail
View/Open


Items in SCIDAR are protected by copyright, with all rights reserved, unless otherwise indicated.