Please use this identifier to cite or link to this item: https://scidar.kg.ac.rs/handle/123456789/9859
Title: Method for determining optimal power transformers exploitation strategy
Authors: Ristic, Olga
Mijailovic, Vladica
Issue Date: 2012
Abstract: The paper suggests a procedure for determining an optimal combination of activities and measures to minimize the expected total costs during the planned exploitation period of power transformers. Combinations of different types of preventive maintenance, spare parts keeping and installation of condition monitoring systems of power transformer individual components are taken into consideration. Power transformer is a complex system, consisting of six components (functional parts). It is assumed that each component has two independent, competing failure modes: a wear-out failure mode, modeled by two-parameter Weibull distribution, and a chance failure mode, characterized by an exponential distribution.The superposition of failures and planned maintenance are taken into account in the analysis of some forms of preventive maintenance. The application of the method suggested and the benefits it provides are demonstrated for one transformer station (TS) 110/10 kV/kV with 2 × 31 500 kVA-110 kV Star-10 kV Delta transformers in case of radial supplying of customers as well as in case when outage of one power transformer does not affect the power supply to customers. © 2011 Elsevier B.V. All rights reserved.
URI: https://scidar.kg.ac.rs/handle/123456789/9859
Type: other
DOI: 10.1016/j.epsr.2011.09.007
ISSN: 0378-7796
SCOPUS: 2-s2.0-84355166635
Appears in Collections:Faculty of Technical Sciences, Čačak

Page views(s)

507

Downloads(s)

10

Files in This Item:
File Description SizeFormat 
PaperMissing.pdf
  Restricted Access
29.86 kBAdobe PDFThumbnail
View/Open


Items in SCIDAR are protected by copyright, with all rights reserved, unless otherwise indicated.