Please use this identifier to cite or link to this item: https://scidar.kg.ac.rs/handle/123456789/10102
Title: Analysis of the electricity production potential in the case of retrofit of steam turbines in a district heating company
Authors: Babic, Milun
Gordić, Dušan
Živković, Dubravka
Končalović, Davor
Issue Date: 2010
Abstract: Today, in Serbia there are several sites with installed combined heat and power facilities. The most of these plants, for various reasons, do not produce electricity. One such plant is Energetika (Kragujevac, Serbia), which is primarily a district heating company. Steam generator in the plant has been installed in the 1970's and has worked in one short period of time. Installed steam turbines are 8 MW and 20 MW rated power. Energetika in accordance with the general trend of increasing energy efficiency of production process initiated revitalization of the plant. This revitalization started with a study which approach and the results are briefly given in the paper. All results show that retrofit of facility should be acceptable for the management. Developed scenarios indicate that in the case of the limited resources optimal retrofit should start with smaller turbine (8 MW rated power) then after providing the funds should continue with the retrofit of 20 MW turbine.
URI: https://scidar.kg.ac.rs/handle/123456789/10102
Type: article
DOI: 10.2298/TSCI100415027B
ISSN: 0354-9836
SCOPUS: 2-s2.0-80054037334
Appears in Collections:Faculty of Engineering, Kragujevac
Institute for Information Technologies, Kragujevac

Page views(s)

836

Downloads(s)

15

Files in This Item:
File Description SizeFormat 
0354-98361000027B.pdf741.74 kBAdobe PDFThumbnail
View/Open


This item is licensed under a Creative Commons License Creative Commons