Please use this identifier to cite or link to this item:
https://scidar.kg.ac.rs/handle/123456789/12295
Title: | Optimizing energy and environmental performance of passive Trombe wall |
Authors: | Bojic, Milorad JOHANNES, Kevyn KUZNIK, Frédéric |
Issue Date: | 2014 |
Abstract: | The energy and environmental performance is compared for buildings with and without Trombe walls. The indicator for environmental performance is a sum of primary operating energy for heating during winter and the annualized embodied energy consumed by using the Trombe walls. Two Trombe walls are used at the south side of a Mozart house located in Lyon, France. The house satisfies the French thermal regulation. The performances of several constructions of Trombe walls are studied. The annualized life cycle energy use by houses with Trombe walls may be lower when the core material has lower density and lower embodied energy. For heating by electricity there are much higher values of the optimum thickness of the core layer and that of the primary energy consumption than that for heating by using natural gas. When the building with Trombe walls is used, the annual final energy saving during heating is around 20%. For the electrical heating and optimum core thickness, the energy ratio is around 6 and the energy payback time is around 8 years. For the natural gas heating these values are around 3, and around 18 years, respectively. © 2013 Elsevier B.V. All rights reserved. |
URI: | https://scidar.kg.ac.rs/handle/123456789/12295 |
Type: | article |
DOI: | 10.1016/j.enbuild.2013.11.062 |
ISSN: | 0378-7788 |
SCOPUS: | 2-s2.0-84891388633 |
Appears in Collections: | Faculty of Engineering, Kragujevac |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PaperMissing.pdf Restricted Access | 29.86 kB | Adobe PDF | View/Open |
Items in SCIDAR are protected by copyright, with all rights reserved, unless otherwise indicated.