Please use this identifier to cite or link to this item: https://scidar.kg.ac.rs/handle/123456789/19178
Full metadata record
DC FieldValueLanguage
dc.contributor.authorCvetković, Dragan-
dc.contributor.authorBojic, Milorad-
dc.contributor.authorMiletic, Marko-
dc.contributor.authorNikolic, Danijela-
dc.contributor.authorSkerlic, Jasmina-
dc.date.accessioned2023-10-27T06:33:13Z-
dc.date.available2023-10-27T06:33:13Z-
dc.date.issued2012-
dc.identifier.isbn978 - 86 - 86663 - 82 - 5en_US
dc.identifier.urihttps://scidar.kg.ac.rs/handle/123456789/19178-
dc.description.abstractOverhang placing prevents the direct solar radiation and thus reduces the energy required for cooling of buildings. For optimization of the overhangs Hooke and Jeeves method was used with the help of code GenOpt. For simulation energy behavior of building, EnergyPlus was used. The aim of this study was to investigate an influence of the timestep of EnergyPlus calculation to the results obtained by optimizing of overhangs. The timestep is used in the zone heat balance model calculation as the driving timestep for heat transfer and load calculations. Increasing the timestep has the effect of reducing the results of primary energy consumption for cooling.en_US
dc.subjecttimestepen_US
dc.subjectEnergy Plusen_US
dc.subjectoptimization of overhangen_US
dc.subjectcoolingen_US
dc.titleINFLUENCE OF THE TIMESTEP ON RESULTS OF OVERHANG OPTIMIZATIONen_US
dc.typeconferenceObjecten_US
dc.relation.conference6th International Quality Conferenceen_US
Appears in Collections:Faculty of Engineering, Kragujevac

Page views(s)

24

Downloads(s)

8

Files in This Item:
File Description SizeFormat 
53.pdf532.7 kBAdobe PDFThumbnail
View/Open


Items in SCIDAR are protected by copyright, with all rights reserved, unless otherwise indicated.